Document Thumbnail

CFI Formwork Inspection

Storage and handling guidelines for 2.0E LVL and CFI Joists manufactured by Pacific Woodtech Corporation.

Store bundles upright on a smooth, level, well-drained, and supportive surface.  Bundles should not be in contact with the ground.

Avoid excessive bowing during all phases of handling and installation.

Never use or field repair a damaged I-joist.

Document Name: CFI Formwork Inspection
File Type: pdf
File Size: 80.2 KB

Products: Industrial Products

Download